Installation Step 2

Install the Chamber

Install the ionization/oxidation chamber according to the diagrams. The electrode chamber may be installed either horizontally or vertically with the quick change unions. Use a suitable PVC joining compound. Install the chamber in the return line to the pool, after the filter and/or heater, with the ionization plates (thick) closest to the filter and oxidization plates (thin) closest to the pool.

Step 1 » Step 2 » Step 3

Please contact your dealer with any questions relating to your Barramundi Freshwater Swimming Pool system. Pool shops supplying non-Barramundi systems do not have the experience to advise you correctly.